You hear us talking about the construction in our building a lot on the radio, but you don't get to see the insanity that is our office.  We are literally working in our studios while the rest of the floor is being systematically demolished.  Every day we come in, their is some new craziness.  Either a hallway can no longer be accessed, or a closet is now a door to Narnia, or they moved the bathrooms.

All of this should be done by the end of 2018.  Fingers crossed that they get it done sooner!

More From 100.5 FM The River